Assessment Year | 2012 |
---|---|
Principal Product | Interior composite wood doors |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
150,560
ft2
|
Annual Production | 941,100
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,344 | 1,866,273 |
kWh
|
$0.066 |
Electricity Demand | $115,675 | 8,598 |
kW-mo/yr
|
$13.45 |
Natural Gas | $44,456 | 4,910 |
MMBtu
|
$9.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,217 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,148 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $15,347 | $20,200 |
$15,347
232,544
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,787 | $200 |
$1,787
27,082
kWh
|
- | - | |
03 | 2.3212: Optimize plant power factor | $6,520 | $10,000 |
$3,363
50,952
kWh
|
$3,157
-
kW-mo/yr
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $449 | $100 |
$449
6,800
kWh
|
- | - | |
05 | 2.7314: Reduce ventilation air | $9,526 | - | - | - |
$9,526
-
MMBtu
|
|
06 | 2.2314: Replace heat treating oven with more efficient unit | $11,148 | $7,000 |
$7,248
109,824
kWh
|
$3,900
-
kW-mo/yr
|
- | |
07 | 2.2437: Recover waste heat from equipment | $3,440 | $10,000 | - | - |
$3,440
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,217 | $47,500 |
$28,194
427,202
kWh
|
$7,057
-
kW-mo/yr
|
$12,966
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,148 | $7,000 |
$7,248
109,824
kWh
|
$3,900
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs