ITAC Assessment: UM0414
ITAC logo
ITAC Assessment: UM0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Interior composite wood doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 150,560
ft2
Annual Production 941,100
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,344 1,866,273
kWh
Electricity Demand $115,675 8,598
kW-mo/yr
Natural Gas $44,456 4,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $15,347 $20,200 $15,347
232,544
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,787 $200 $1,787
27,082
kWh
- -
03 2.3212: Optimize plant power factor $6,520 $10,000 $3,363
50,952
kWh
$3,157
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $449 $100 $449
6,800
kWh
- -
05 2.7314: Reduce ventilation air $9,526 - - - $9,526
-
MMBtu
06 2.2314: Replace heat treating oven with more efficient unit $11,148 $7,000 $7,248
109,824
kWh
$3,900
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $3,440 $10,000 - - $3,440
-
MMBtu
TOTAL RECOMMENDED $48,217 $47,500 $28,194
427,202
kWh
$7,057
-
kW-mo/yr
$12,966
-
MMBtu
TOTAL IMPLEMENTED $11,148 $7,000 $7,248
109,824
kWh
$3,900
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs