Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product textile machinery
NAICS
n/a
SIC 3552: Textile Machinery
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 130,000
ft2
Annual Production 3
pieces
Production Hrs. Annual 2,085
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,022 1,666,764
kWh
Natural Gas $51,380 6,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,129

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,525 $5,100 $2,525
22,274
kWh
-
02 2.6232: Install set-back timers $1,718 $150 $1,718
33,118
kWh
-
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $731 - - $731
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $475 - $475
7,327
kWh
-
05 2.7135: Install occupancy sensors $398 $422 $398
7,327
kWh
-
TOTAL RECOMMENDED $5,847 $5,672 $5,116
70,046
kWh
$731
-
MMBtu
TOTAL IMPLEMENTED $4,129 $5,522 $3,398
36,928
kWh
$731
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs