ITAC Assessment: IP7026
ITAC logo
ITAC Assessment: IP7026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product N/A
NAICS 813110: Religious Organizations
SIC 8661: Religious Organizations
Sales Range less than $500
k
# of Employees 2
Plant Area 44,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,212 99,357
kWh
Natural Gas $7,388 1,136
MMBtu
Waste Disposal Costs
Water Usage $2,464 456
Tgal
Water Disposal $4,436 456
Tgal
TOTAL YEARLY COSTS $26,500
RECOMMENDED SAVINGS* $10,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,139 $283 $2,139
17,394
kWh
-
02 2.7135: Install occupancy sensors $1,033 $1,104 $1,033
8,400
kWh
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $103 $140 - $103
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $284 $391 $284
2,313
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,603 $19,501 $6,603
53,685
kWh
-
TOTAL RECOMMENDED $10,162 $21,419 $10,059
81,792
kWh
$103
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs