ITAC Assessment: UU0123
ITAC logo
ITAC Assessment: UU0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 291,850,000
ft2
Annual Production 802,145
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,887 1,742,135
kWh
Waste Disposal Costs
Water Usage $254,280 802,145
Tgal
TOTAL YEARLY COSTS $330,167
RECOMMENDED SAVINGS* $41,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings
01 3.4154: Eliminate leaks in water lines and valves $22,871 $23,400 - $22,871
-
Tgal
02 3.1191: Change procedures / equipment / operating conditions $7,624 $13,970 - $7,624
-
Tgal
03 3.4155: Meter waste water $4,100 - $4,100
94,130
kWh
-
04 2.4131: Size electric motors for peak operating efficiency $3,374 $5,770 $3,374
77,457
kWh
-
05 2.4131: Size electric motors for peak operating efficiency $3,114 $4,625 $3,114
71,498
kWh
-
TOTAL RECOMMENDED $41,083 $47,765 $10,588
243,085
kWh
$30,495
-
Tgal
TOTAL IMPLEMENTED $36,983 $47,765 $6,488
148,955
kWh
$30,495
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs