ITAC Assessment: BD0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Shipping Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 225,000
ft2
Annual Production 800,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,652 3,863,040
kWh
Electricity Demand $56,103 8,631
kW-mo/yr
Natural Gas $243,478 40,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $311,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,709

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.1224: Replace boiler $17,844 $70,000 - - $17,844
-
MMBtu
- - -
02 2.7231: Use radiant heater for spot heating $16,703 $20,000 n/a - - $16,703
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $11,656 $13,200 n/a $9,604
217,292
kWh
$2,052
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $3,764 $3,075 $2,884
65,240
kWh
$880
-
kW-mo/yr
- - - -
05 2.4239: Eliminate or reduce compressed air usage $2,605 $1,100 $2,037
46,073
kWh
$568
-
kW-mo/yr
- - - -
06 2.2414: Use waste heat from hot flue gases to preheat $2,383 $2,000 - - $2,383
-
MMBtu
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,219 $600 $995
77
kWh
$224
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $999 $2,975 - $150
-
kW-mo/yr
- $530
-
Tgal
- $319
09 2.4221: Install compressor air intakes in coolest locations $931 $1,000 $726
16,413
kWh
$205
-
kW-mo/yr
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $333 $162
3,664
kWh
$33
-
kW-mo/yr
- - - $151
11 3.3131: Use evaporation to concentrate material $2,259 $3,600 - - - $2,259
-
Tgal
- -
12 3.4151: Minimize water usage $219 $1,000 - - - $219
-
Tgal
- -
13 4.445: Install equipment to move product $182,593 $180,000 n/a $1,273
98
kWh
$360
-
kW-mo/yr
- - $180,960 -
14 4.441: Install automatic packing equipment $59,860 $35,000 n/a - - - - $59,860 -
15 4.652: Replace existing equipment with more suitable substitutes $5,000 $2,500 - - - - - $5,000
16 4.447: Automate payroll system $3,016 $2,495 - - - - - $3,016
TOTAL RECOMMENDED $311,397 $338,878 $17,681
348,857
kWh
$4,472
-
kW-mo/yr
$36,930
-
MMBtu
$3,008
-
Tgal
$240,820 $8,486
TOTAL IMPLEMENTED $26,709 $76,108 $6,804
131,467
kWh
$1,910
-
kW-mo/yr
$17,844
-
MMBtu
- - $151
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs