ITAC Assessment: CO0675
ITAC logo
ITAC Assessment: CO0675
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Diamond cutting wire
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 132,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,497 5,209,729
kWh
Electricity Demand $164,375 8,825
kW-mo/yr
Electricity Fees $6,843 -
Natural Gas $79,085 9,679
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $30,250 $172,320 $10,180
319,200
kWh
$20,070
-
kW-mo/yr
- - -
02 2.7232: Replace existing hvac unit with high efficiency model $9,730 $18,100 - - $9,730
-
MMBtu
- -
03 2.7135: Install occupancy sensors $810 $1,280 $570
26,400
kWh
- - $170 $70
04 2.7447: Install vinyl strip / high speed / air curtain doors $270 $290 - - $270
-
MMBtu
- -
TOTAL RECOMMENDED $41,060 $191,990 $10,750
345,600
kWh
$20,070
-
kW-mo/yr
$10,000
-
MMBtu
$170 $70
TOTAL IMPLEMENTED $270 $290 - - $270
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs