ITAC Assessment: CO0659
ITAC logo
ITAC Assessment: CO0659
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Precision Sheet Metal Fabrication
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 43,200
ft2
Annual Production 6,500
pieces
Production Hrs. Annual 2,741
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,100 851,100
kWh
Electricity Demand $57,171 2,816
kW-mo/yr
Electricity Fees $1,279 -
Natural Gas $10,425 1,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,680 $25,960 $2,970
48,800
kWh
$2,710
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,470 $500 $990
16,300
kWh
$480
-
kW-mo/yr
- - - -
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $21,530 $6,400 $5,830
95,700
kWh
$15,700
-
kW-mo/yr
- - - -
04 2.8121: Apply for tax-free status for energy purchases $3,180 $500 - - - - $3,180 -
05 2.7444: Close holes and openings in building such as broken windows $2,570 - $820
13,400
kWh
$360
-
kW-mo/yr
$1,390
-
MMBtu
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $380 $1,240 $310
5,100
kWh
- - $40 - $30
TOTAL RECOMMENDED $34,810 $34,600 $10,920
179,300
kWh
$19,250
-
kW-mo/yr
$1,390
-
MMBtu
$40 $3,180 $30
TOTAL IMPLEMENTED $9,720 $26,460 $4,780
78,500
kWh
$3,550
-
kW-mo/yr
$1,390
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs