ITAC Assessment: AM0796
ITAC logo
ITAC Assessment: AM0796
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product PTFE polymer seals, rods, cylinders and sheets
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 75,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 6,192
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,836 6,197,174
kWh
Electricity Demand $134,743 16,063
kW-mo/yr
Electricity Fees $35,209 -
Natural Gas $19,193 2,501
MMBtu
Waste Disposal Costs
Water Usage $35 5
Tgal
TOTAL YEARLY COSTS $480,016
RECOMMENDED SAVINGS* $203,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $163,700 $7,500 - - $32,740 - $130,960
02 2.3212: Optimize plant power factor $20,000 $47,510 - $20,000
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,300 $11,500 $6,700
129,000
kWh
$2,300
-
kW-mo/yr
- $300 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,470 $30 $3,330
64,000
kWh
$1,140
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,880 $3,720 $2,880
55,400
kWh
- - - -
06 2.4314: Use synthetic lubricant $1,230 $200 $910
17,500
kWh
$320
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $830 $150 $830
16,000
kWh
- - - -
08 2.2511: Insulate bare equipment $590 $86 $435
8,530
kWh
$155
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $203,000 $70,696 $15,085
290,430
kWh
$23,915
-
kW-mo/yr
$32,740 $300 $130,960
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs