Assessment Year | 2008 |
---|---|
Principal Product | Mass flow meters |
NAICS | 334514: Totalizing Fluid Meter and Counting Device Manufacturing |
SIC | 3824: Totalizing Fluid Meters and Counting Devices |
Sales Range | $100 M to 500M |
# of Employees | 650 |
Plant Area |
226,223
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 6,432
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,020 | 3,758,198 |
kWh
|
$0.032 |
Electricity Demand | $122,139 | 7,750 |
kW-mo/yr
|
$15.76 |
Electricity Fees | $1,082 | - |
|
- |
Natural Gas | $48,818 | 5,848 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,850 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,220 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $27,040 | $12,030 |
$18,840
386,000
kWh
|
$8,200
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $9,230 | $3,000 |
$9,230
189,000
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,500 | $3,000 |
$4,670
95,600
kWh
|
$1,830
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,060 | $120 |
$2,660
54,500
kWh
|
$1,400
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $6,330 | $9,130 | - | - |
$6,330
-
MMBtu
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $2,300 | $39,600 |
$1,350
27,600
kWh
|
$950
-
kW-mo/yr
|
- | |
07 | 2.7442: Keep doors and windows shut when not on use | $1,390 | $1,000 | - | - |
$1,390
-
MMBtu
|
|
TOTAL RECOMMENDED | $56,850 | $67,880 |
$36,750
752,700
kWh
|
$12,380
-
kW-mo/yr
|
$7,720
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,220 | $13,130 |
$4,670
95,600
kWh
|
$1,830
-
kW-mo/yr
|
$7,720
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs