ITAC Assessment: CO0613
ITAC logo
ITAC Assessment: CO0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Mass flow meters
NAICS 334514: Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $100
M
to 500
M
# of Employees 650
Plant Area 226,223
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 6,432
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,020 3,758,198
kWh
Electricity Demand $122,139 7,750
kW-mo/yr
Electricity Fees $1,082 -
Natural Gas $48,818 5,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $27,040 $12,030 $18,840
386,000
kWh
$8,200
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $9,230 $3,000 $9,230
189,000
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,500 $3,000 $4,670
95,600
kWh
$1,830
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,060 $120 $2,660
54,500
kWh
$1,400
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $6,330 $9,130 - - $6,330
-
MMBtu
06 2.7232: Replace existing hvac unit with high efficiency model $2,300 $39,600 $1,350
27,600
kWh
$950
-
kW-mo/yr
-
07 2.7442: Keep doors and windows shut when not on use $1,390 $1,000 - - $1,390
-
MMBtu
TOTAL RECOMMENDED $56,850 $67,880 $36,750
752,700
kWh
$12,380
-
kW-mo/yr
$7,720
-
MMBtu
TOTAL IMPLEMENTED $14,220 $13,130 $4,670
95,600
kWh
$1,830
-
kW-mo/yr
$7,720
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs