ITAC Assessment: SF0039
ITAC logo
ITAC Assessment: SF0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pre-Fabricated Storage Racks
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 1,260
ton
Production Hrs. Annual 2,184
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,954 3,306,858
kWh
Natural Gas $112,284 29,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,389

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1213: Direct warmest air to combustion intake $2,078 $4,752 - $2,078
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $10,590 $2,750 $10,590
105,803
kWh
-
03 2.2511: Insulate bare equipment $2,733 $3,713 - $2,733
-
MMBtu
04 2.7135: Install occupancy sensors $2,811 $2,400 $2,811
28,136
kWh
-
05 2.7131: Add area lighting switches $1,444 $130 $1,444
14,361
kWh
-
06 2.3212: Optimize plant power factor $2,458 $4,153 $2,458
-
kWh
-
07 2.4133: Use most efficient type of electric motors $1,811 $2,759 $1,811
18,171
kWh
-
TOTAL RECOMMENDED $23,925 $20,657 $19,114
166,471
kWh
$4,811
-
MMBtu
TOTAL IMPLEMENTED $19,389 $11,752 $16,656
166,471
kWh
$2,733
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs