ITAC Assessment: SF0009
ITAC logo
ITAC Assessment: SF0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Printed Circuits
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 13,500
ft2
Annual Production 5
thousand feet
Production Hrs. Annual 3,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,852 380,422
kWh
Natural Gas $881 125
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8114: Change rate schedules or other changes in utility service $2,671 $1,500 $2,671
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,545 $2,947 $1,545
12,896
kWh
03 2.4221: Install compressor air intakes in coolest locations $290 $235 $290
3,517
kWh
04 2.4323: Use optimum size and capacity equipment $1,790 $1,200 $1,790
15,533
kWh
05 2.4133: Use most efficient type of electric motors $880 $694 $880
7,327
kWh
TOTAL RECOMMENDED $7,176 $6,576 $7,176
39,273
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs