Assessment Year | 2003 |
---|---|
Principal Product | Photovoltaic & fiber optic equipment |
NAICS | 334413: Semiconductor and Related Device Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
135,750
ft2
|
Annual Production | 2,100,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Mexico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $736,104 | 18,515,100 |
kWh
|
$0.040 |
Electricity Demand | $196,329 | 28,953 |
kW-mo/yr
|
$6.78 |
Electricity Fees | $140,671 | - |
|
- |
Natural Gas | $335,029 | 57,028 |
MMBtu
|
$5.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,940 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $20,940 | $4,360 |
$14,940
378,000
kWh
|
$6,000
-
kW-mo/yr
|
|
02 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $13,340 | $14,640 |
$9,830
258,000
kWh
|
$3,510
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,850 | $16,010 |
$8,850
226,500
kWh
|
- | |
04 | 2.3191: Use demand controller or load shedder | $6,000 | $3,000 | - |
$6,000
-
kW-mo/yr
|
|
05 | 2.4323: Use optimum size and capacity equipment | $5,720 | $13,150 |
$4,080
103,400
kWh
|
$1,640
-
kW-mo/yr
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,940 | $10,310 |
$3,500
88,500
kWh
|
$1,440
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $59,790 | $61,470 |
$41,200
1,054,400
kWh
|
$18,590
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $20,940 | $4,360 |
$14,940
378,000
kWh
|
$6,000
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs