ITAC Assessment: CO0378
ITAC logo
ITAC Assessment: CO0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product injection molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 58,875
ft2
Annual Production 10,165,113
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,408 2,116,061
kWh
Electricity Demand $49,860 5,511
kW-mo/yr
Electricity Fees $2 -
Natural Gas $6,385 1,712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,430 $15,373 $2,747
83,236
kWh
$1,683
-
kW-mo/yr
- - - - -
02 4.652: Replace existing equipment with more suitable substitutes $4,590 $630 - - - - - - $4,590
03 3.8132: Use less toxic and volatile solvent substitutes $1,940 $1,790 - - - $2,250
-
gal
- $(-310.0) -
04 2.2612: Use cooling tower water instead of refrigeration $1,770 $3,010 $1,770
58,324
kWh
- - - - - -
05 3.6192: Use a less expensive method of waste removal $500 - - - - - $500
-
lb
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $360 $160 $230
7,327
kWh
$130
-
kW-mo/yr
- - - - -
07 2.4221: Install compressor air intakes in coolest locations $330 $150 $210
6,741
kWh
$120
-
kW-mo/yr
- - - - -
08 2.4133: Use most efficient type of electric motors $44 $58 $28
879
kWh
$16
-
kW-mo/yr
- - - - -
09 2.7261: Install timers and/or thermostats $200 $160 $100
3,224
kWh
- $100
-
MMBtu
- - - -
TOTAL RECOMMENDED $14,164 $21,331 $5,085
159,731
kWh
$1,949
-
kW-mo/yr
$100
-
MMBtu
$2,250
-
gal
$500
-
lb
$(-310.0) $4,590
TOTAL IMPLEMENTED $10,254 $16,371 $3,215
98,183
kWh
$1,949
-
kW-mo/yr
- - $500
-
lb
- $4,590
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs