Assessment Year | 1996 |
---|---|
Principal Product | egg products |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
57,000
ft2
|
Annual Production | 19,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,307 | 4,930,832 |
kWh
|
$0.024 |
Electricity Demand | $150,451 | 12,036 |
kW-mo/yr
|
$12.50 |
Electricity Fees | $(-2.0) | - |
|
- |
Natural Gas | $254,537 | 94,340 |
MMBtu
|
$2.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,645 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $6,270 | $13,320 |
$(-430.0)
(-18,171)
kWh
|
$(-1,570.0)
-
kW-mo/yr
|
- |
$8,270
-
Tgal
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,250 | $1,500 | - | - |
$6,250
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,740 | $3,135 |
$765
31,946
kWh
|
$975
-
kW-mo/yr
|
- | - | |
04 | 3.4115: Recover and reuse cooling water | $2,320 | $3,900 | - | - | - |
$2,320
-
Tgal
|
|
05 | 2.4133: Use most efficient type of electric motors | $375 | $693 |
$165
7,034
kWh
|
$210
-
kW-mo/yr
|
- | - | |
06 | 2.1213: Direct warmest air to combustion intake | $1,940 | $800 | - | - |
$1,940
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,770 | $740 |
$740
31,067
kWh
|
$1,030
-
kW-mo/yr
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,360 | $1,600 |
$340
14,068
kWh
|
$1,020
-
kW-mo/yr
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,080 | $1,780 |
$540
22,567
kWh
|
$540
-
kW-mo/yr
|
- | - | |
10 | 2.2122: Install / repair insulation on condensate lines | $540 | $500 | - | - |
$540
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $23,645 | $27,968 |
$2,120
88,511
kWh
|
$2,205
-
kW-mo/yr
|
$8,730
-
MMBtu
|
$10,590
-
Tgal
|
||
TOTAL IMPLEMENTED | $19,805 | $25,068 |
$1,780
74,443
kWh
|
$1,185
-
kW-mo/yr
|
$6,250
-
MMBtu
|
$10,590
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs