Assessment Year | 2006 |
---|---|
Principal Product | Mechanical Metal Forming Presses |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $50 M to 100M |
# of Employees | 485 |
Plant Area |
614,000
ft2
|
Annual Production | 80
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $915,159 | 21,093,062 |
kWh
|
$0.043 |
Natural Gas | $436,165 | 50,028 |
MMBtu
|
$8.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $332,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $322,450 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $252,912 | $3,750 | - | - |
$252,912
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,973 | $29,659 |
$20,195
696,384
kWh
|
$9,568
-
kW-mo/yr
|
- | - | $3,210 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,688 | $59,616 |
$13,463
464,256
kWh
|
$6,398
-
kW-mo/yr
|
- | - | $827 | - | |
04 | 3.5311: Recover and reuse waste material | $8,505 | $5,000 | - | - | - |
$6,300
-
gal
|
$2,205 | - | |
05 | 2.4224: Upgrade controls on compressors | $5,125 | - |
$3,474
119,808
kWh
|
$1,651
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,136 | - |
$1,969
67,893
kWh
|
$2,167
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,883 | - |
$1,954
67,392
kWh
|
$929
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.5316: Contract a wood pallet recycling company | $2,035 | - | - | - | - | - | - | $2,035 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,735 | - |
$961
33,150
kWh
|
$774
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,267 | - |
$854
29,952
kWh
|
$413
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $512 | $2,200 |
$347
11,981
kWh
|
$165
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $332,771 | $100,225 |
$43,217
1,490,816
kWh
|
$22,065
-
kW-mo/yr
|
$252,912
-
MMBtu
|
$6,300
-
gal
|
$6,242 | $2,035 | ||
TOTAL IMPLEMENTED | $322,450 | $100,225 |
$38,440
1,325,579
kWh
|
$18,556
-
kW-mo/yr
|
$252,912
-
MMBtu
|
$6,300
-
gal
|
$6,242 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs