ITAC Assessment: OR0584
ITAC logo
ITAC Assessment: OR0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Canned Goods
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $5
M
to 10
M
# of Employees 475
Plant Area 610,000
ft2
Annual Production 18,500
ton
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,785 6,075,210
kWh
Electricity Demand $118,122 17,448
kW-mo/yr
Natural Gas $547,146 97,150
MMBtu
LPG $31,920 1,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $6,320 - $3,781
72,633
kWh
$2,539
-
kW-mo/yr
- - - - -
02 2.2121: Increase amount of condensate returned $26,558 $19,925 - - $21,084
-
MMBtu
- - - $5,474
-
Tgal
03 2.8227: Adjust / maintain fork lift trucks for most efficient operation $16,839 $29,000 $(-4,547.0)
(-87,360)
kWh
$(-11,374.0)
-
kW-mo/yr
- $20,160
-
MMBtu
$12,600 - -
04 2.4322: Use or replace with energy efficient substitutes $12,631 $27,000 $12,631
242,665
kWh
- - - - - -
05 3.4151: Minimize water usage $4,574 $7,000 - - - - - - $4,574
-
Tgal
06 2.2444: Use hot process fluids to preheat incoming process fluids $7,796 $19,701 - - $7,796
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $54,152 $251,677 $38,013
730,325
kWh
$10,318
-
kW-mo/yr
- - $323 $5,498 -
TOTAL RECOMMENDED $128,870 $354,303 $49,878
958,263
kWh
$1,483
-
kW-mo/yr
$28,880
-
MMBtu
$20,160
-
MMBtu
$12,923 $5,498 $10,048
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs