| Assessment Year | 1986 |
|---|---|
| Principal Product | STEEL UTILITY POLES |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,541 | 2,153,869 |
kWh
|
$0.058 |
| Natural Gas | $52,483 | 13,632 |
MMBtu
|
$3.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,946 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $1,745 | $485 | - |
$1,745
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,403 | - |
$4,843
109,027
kWh
|
- | $(-440.0) | |
| 03 | 2.7261: Install timers and/or thermostats | $378 | $450 | - |
$378
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,372 | $212 |
$1,372
28,136
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,167 | $1,575 |
$11,167
157,386
kWh
|
- | - | |
| 06 | 2.6232: Install set-back timers | $1,748 | - |
$1,748
29,015
kWh
|
- | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,133 | - |
$3,702
-
kWh
|
- | $(-569.0) | |
| TOTAL RECOMMENDED | $23,946 | $2,722 |
$22,832
323,564
kWh
|
$2,123
-
MMBtu
|
$(-1,009.0) | ||
| TOTAL IMPLEMENTED | $23,946 | $2,722 |
$22,832
323,564
kWh
|
$2,123
-
MMBtu
|
$(-1,009.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs