Assessment Year | 1995 |
---|---|
Principal Product | Industrial racks and shelves |
NAICS |
n/a
|
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
66,000
ft2
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,518 | 1,114,302 |
kWh
|
$0.059 |
Natural Gas | $32,199 | 7,900 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $136,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.2121: Convert to electrostatic powder coating | $91,310 | $150,000 | - |
$7,290
-
MMBtu
|
- | - | $84,020 | |
02 | 2.4239: Eliminate or reduce compressed air usage | $39,490 | $50,000 |
$2,970
49,824
kWh
|
$(-5,080.0)
-
MMBtu
|
- | $41,600 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,340 | $16,770 |
$4,340
81,770
kWh
|
- | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,140 | $520 |
$1,140
20,809
kWh
|
- | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $430 | $1,260 |
$430
7,327
kWh
|
- | - | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $250 | $620 | - |
$250
-
MMBtu
|
- | - | - | |
07 | 3.8132: Use less toxic and volatile solvent substitutes | $210 | $530 | - | - |
$210
-
gal
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $200 | $240 |
$200
3,224
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $137,370 | $219,940 |
$9,080
162,954
kWh
|
$2,460
-
MMBtu
|
$210
-
gal
|
$41,600 | $84,020 | ||
TOTAL IMPLEMENTED | $136,710 | $218,550 |
$8,880
159,730
kWh
|
$2,210
-
MMBtu
|
- | $41,600 | $84,020 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs