Assessment Year | 2004 |
---|---|
Principal Product | boat/repair |
NAICS | 336611: Ship Building and Repairing |
SIC | 3731: Ship Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
250,000
ft2
|
Annual Production | 180
pieces
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,342 | 3,097,193 |
kWh
|
$0.056 |
Electricity Demand | $49,246 | 12,311 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $8,436 | - |
|
- |
Natural Gas | $944 | 204 |
MMBtu
|
$4.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,981 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,117 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $69,470 | $20,680 |
$66,927
1,196,762
kWh
|
$2,543 | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $14,991 | $16,845 |
$14,442
258,033
kWh
|
$549 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,972 | $500 | - | - | $9,972 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,675 | $30 |
$6,431
114,898
kWh
|
$244 | - | |
05 | 2.7132: Install timers on light switches in little used areas | $3,376 | $135 |
$3,252
58,111
kWh
|
$124 | - | |
06 | 2.7135: Install occupancy sensors | $1,329 | $390 |
$1,280
22,872
kWh
|
$49 | - | |
07 | 2.7134: Use photocell controls | $726 | $150 |
$700
12,501
kWh
|
$26 | - | |
08 | 2.7224: Reduce space conditioning during non-working hours | $442 | $198 |
$426
7,604
kWh
|
$16 | - | |
TOTAL RECOMMENDED | $106,981 | $38,928 |
$93,458
1,670,781
kWh
|
$3,551 | $9,972 | ||
TOTAL IMPLEMENTED | $86,117 | $21,210 |
$73,358
1,311,660
kWh
|
$2,787 | $9,972 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs