ITAC Assessment: CO0324
ITAC logo
ITAC Assessment: CO0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Conductive Coating of Glass Plates
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 81,150
ft2
Annual Production 9,600,000
thousand feet
Production Hrs. Annual 6,859
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $416,783 8,176,436
kWh
Natural Gas $3,273 736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,770 $15,680 $5,770
106,975
kWh
- -
02 2.4133: Use most efficient type of electric motors $4,230 $2,740 $4,230
79,719
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,960 $3,250 $2,960
56,565
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $2,500 $250 - - $2,500
05 2.4221: Install compressor air intakes in coolest locations $1,570 $690 $1,570
32,532
kWh
- -
06 2.2447: Heat water with exhaust heat $1,430 $5,000 $1,430
47,186
kWh
- -
07 2.7261: Install timers and/or thermostats $680 $450 - $680
-
MMBtu
-
TOTAL RECOMMENDED $19,140 $28,060 $15,960
322,977
kWh
$680
-
MMBtu
$2,500
TOTAL IMPLEMENTED $2,500 $250 - - $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs