ITAC Assessment: CO0317
ITAC logo
ITAC Assessment: CO0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product capacitors and resistors
NAICS
n/a
SIC 3675: Electronic Capacitors
Sales Range $1
M
to 5
M
# of Employees 95
Plant Area 75,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,740 1,417,937
kWh
Natural Gas $15,500 3,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Gaseous Waste Savings
01 3.8122: Use tight-fitting lids on material containers to reduce voc emissions $6,860 $720 - - $5,300
-
gal
$1,560
-
lb
02 3.8142: Distill contaminated solvents for reuse $3,603 $7,080 $(-42.0)
(-879)
kWh
- $3,645
-
gal
-
03 2.2511: Insulate bare equipment $1,790 $520 $1,790
36,049
kWh
- - -
04 2.7261: Install timers and/or thermostats $1,600 $150 $750
14,947
kWh
$850
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,270 $2,070 $1,270
25,498
kWh
- - -
06 2.4133: Use most efficient type of electric motors $880 $1,340 $880
17,878
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $700 $300 $700
14,068
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $460 $150 $460
9,379
kWh
- - -
09 3.5248: Separate and recycle scrap metal to foundry or for sale - $140 - - - -
TOTAL RECOMMENDED $17,163 $12,470 $5,808
116,940
kWh
$850
-
MMBtu
$8,945
-
gal
$1,560
-
lb
TOTAL IMPLEMENTED $4,450 $4,000 $3,600
72,391
kWh
$850
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs