ITAC Assessment: CO0312
ITAC logo
ITAC Assessment: CO0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product snowblowing vehicles
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 65,000
ft2
Annual Production 30
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,900 1,096,424
kWh
Natural Gas $30,870 7,368
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,790

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,660 $3,200 $3,660
55,686
kWh
- -
02 2.7261: Install timers and/or thermostats $1,960 $1,050 $820
29,894
kWh
$1,140
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $1,410 $210 $1,410
21,688
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $790 $(-290.0) $790
12,016
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $500 $150 $500
7,620
kWh
- -
06 2.2511: Insulate bare equipment $380 $320 - $380
-
MMBtu
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $300 $100 - - $300
TOTAL RECOMMENDED $9,000 $4,740 $7,180
126,904
kWh
$1,520
-
MMBtu
$300
TOTAL IMPLEMENTED $6,790 $4,280 $5,270
97,596
kWh
$1,520
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs