ITAC Assessment: CO0307
ITAC logo
ITAC Assessment: CO0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product wood preservatives
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 124,850
ft2
Annual Production 12,700,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,420 2,778,722
kWh
Natural Gas $53,510 12,771
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $4,670 $250 - - $4,670
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,540 $6,360 $2,540
39,273
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,940 $160 $1,940
30,188
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,050 $500 $1,050
16,120
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,020 $4,520 $1,020
15,826
kWh
- -
06 2.7444: Close holes and openings in building such as broken windows $340 $980 - $340
-
MMBtu
-
TOTAL RECOMMENDED $11,560 $12,770 $6,550
101,407
kWh
$340
-
MMBtu
$4,670
TOTAL IMPLEMENTED $6,610 $410 $1,940
30,188
kWh
- $4,670
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs