ITAC Assessment: SD0613
ITAC logo
ITAC Assessment: SD0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aircraft parts and assemblies
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 48,000
ft2
Annual Production 7,500
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,642 1,194,466
kWh
Electricity Demand $180,271 4,292
kW-mo/yr
Electricity Fees $(-84,969.0) -
TOTAL YEARLY COSTS $211,944
RECOMMENDED SAVINGS* $18,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,466

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7232: Replace existing hvac unit with high efficiency model $7,677 $16,500 $4,666
47,763
kWh
$3,011
-
kW-mo/yr
-
02 2.4237: Substitute compressed air cooling with water or air cooling $8,370 $5,000 $1,547
15,839
kWh
$6,823
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,201 $1,065 $630
6,452
kWh
$542
-
kW-mo/yr
$29
04 2.7111: Reduce illumination to minimum necessary levels $590 $1,500 $317
3,240
kWh
$273
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $218 $2,500 $218
2,229
kWh
- -
TOTAL RECOMMENDED $18,056 $26,565 $7,378
75,523
kWh
$10,649
-
kW-mo/yr
$29
TOTAL IMPLEMENTED $17,466 $25,065 $7,061
72,283
kWh
$10,376
-
kW-mo/yr
$29
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs