ITAC Assessment: UA0228
ITAC logo
ITAC Assessment: UA0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Wooden Stair Parts
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 300,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,813 1,304,579
kWh
Electricity Fees $12,863 -
TOTAL YEARLY COSTS $189,676
RECOMMENDED SAVINGS* $16,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Administrative Changes Savings
01 2.3137: Use power during off-peak periods $8,116 $100 - $515 $7,601
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,664 $11,337 $6,241
46,050
kWh
$423 -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,337 $1,553 $1,252
9,239
kWh
$85 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $164 $419 $154
1,135
kWh
$10 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $100 $50 $94
693
kWh
$6 -
TOTAL RECOMMENDED $16,381 $13,459 $7,741
57,117
kWh
$1,039 $7,601
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs