Assessment Year | 2023 |
---|---|
Principal Product | Stators and Pumps |
NAICS | 333996: Fluid Power Pump and Motor Manufacturing |
SIC | 3594: Fluid Power Pumps and Motors |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
78,541
ft2
|
Annual Production | 23,858
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $108,126 | 1,236,200 |
kWh
|
$0.087 | |
Electricity Demand | $25,420 | 4,701 |
kW-mo/yr
|
$5.41 | |
Electricity Fees | $748 | - |
|
- | |
Natural Gas | $31,201 | 2,790 |
MMBtu
|
$11.18 | |
Other Energy | $2,537 | 1 |
MMBtu
|
$2,537.00 | |
Waste Disposal Costs | |||||
Water Usage | $1,863 | 550 |
Tgal
|
$3.39 | |
Water Disposal | $1,728 | 251 |
Tgal
|
$6.88 | |
TOTAL YEARLY COSTS | $171,623 | ||||
RECOMMENDED SAVINGS* | $65,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,520 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,507 | $1,764 |
$3,082
35,225
kWh
|
$533
-
kW-mo/yr
|
$13,892
-
MMBtu
|
|
02 | 2.7224: Reduce space conditioning during non-working hours | $6,024 | $375 | - | - |
$6,024
-
MMBtu
|
|
03 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $5,796 | $340 |
$637
7,274
kWh
|
- |
$5,159
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,383 | $8,996 |
$5,383
61,516
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $496 | $952 |
$383
4,372
kWh
|
$113
-
kW-mo/yr
|
- | |
06 | 2.2314: Replace heat treating oven with more efficient unit | $29,842 | $100,000 |
$23,015
263,032
kWh
|
$6,827
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $65,047 | $112,427 |
$32,500
371,419
kWh
|
$7,473
-
kW-mo/yr
|
$25,075
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,520 | $1,327 |
$383
4,372
kWh
|
$113
-
kW-mo/yr
|
$6,024
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs