ITAC Assessment: UD1061
ITAC logo
ITAC Assessment: UD1061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Stators and Pumps
NAICS 333996: Fluid Power Pump and Motor Manufacturing
SIC 3594: Fluid Power Pumps and Motors
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 78,541
ft2
Annual Production 23,858
units
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,126 1,236,200
kWh
Electricity Demand $25,420 4,701
kW-mo/yr
Electricity Fees $748 -
Natural Gas $31,201 2,790
MMBtu
Other Energy $2,537 1
MMBtu
Waste Disposal Costs
Water Usage $1,863 550
Tgal
Water Disposal $1,728 251
Tgal
TOTAL YEARLY COSTS $171,623
RECOMMENDED SAVINGS* $65,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,507 $1,764 $3,082
35,225
kWh
$533
-
kW-mo/yr
$13,892
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $6,024 $375 - - $6,024
-
MMBtu
03 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,796 $340 $637
7,274
kWh
- $5,159
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,383 $8,996 $5,383
61,516
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $496 $952 $383
4,372
kWh
$113
-
kW-mo/yr
-
06 2.2314: Replace heat treating oven with more efficient unit $29,842 $100,000 $23,015
263,032
kWh
$6,827
-
kW-mo/yr
-
TOTAL RECOMMENDED $65,047 $112,427 $32,500
371,419
kWh
$7,473
-
kW-mo/yr
$25,075
-
MMBtu
TOTAL IMPLEMENTED $6,520 $1,327 $383
4,372
kWh
$113
-
kW-mo/yr
$6,024
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs