ITAC Assessment: CO0305
ITAC logo
ITAC Assessment: CO0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product corrugated packaging
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 155,000
ft2
Annual Production 56,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,200 4,486,811
kWh
Natural Gas $240,000 71,217
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7442: Keep doors and windows shut when not on use $16,210 $210,000 - $16,210
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,440 $6,760 $4,440
81,770
kWh
- -
03 2.4133: Use most efficient type of electric motors $3,830 $2,600 $3,830
70,340
kWh
- -
04 2.8114: Change rate schedules or other changes in utility service $3,550 $10,000 - - $3,550
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,270 $4,330 $3,270
60,082
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,160 $590 $3,160
58,030
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $2,780 $370 $2,780
50,996
kWh
- -
08 2.2414: Use waste heat from hot flue gases to preheat $2,255 $7,730 $(-112.0)
(-2,052)
kWh
$2,367
-
MMBtu
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,010 $30 $2,010
36,928
kWh
- -
10 2.7135: Install occupancy sensors $1,450 $1,700 $1,345
24,619
kWh
$105
-
MMBtu
-
11 2.2136: Install / repair insulation on steam lines $1,290 $1,190 - $1,290
-
MMBtu
-
TOTAL RECOMMENDED $44,245 $245,300 $20,723
380,713
kWh
$19,972
-
MMBtu
$3,550
TOTAL IMPLEMENTED $27,880 $218,910 $10,380
190,796
kWh
$17,500
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings