ITAC Assessment: CO0301
ITAC logo
ITAC Assessment: CO0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Satellite and Aircraft Products
NAICS
n/a
SIC 3671: Electron Tubes
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 250,000
ft2
Annual Production 7
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,760 3,957,503
kWh
Natural Gas $52,260 13,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,620 $6,000 $2,620
44,842
kWh
02 2.4133: Use most efficient type of electric motors $2,510 $7,250 $2,510
43,083
kWh
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $2,270 $6,000 $2,270
85,287
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $570 $2,270 $570
20,809
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $310 $570
9,965
kWh
06 2.4221: Install compressor air intakes in coolest locations $400 $470 $400
6,741
kWh
TOTAL RECOMMENDED $8,940 $22,300 $8,940
210,727
kWh
TOTAL IMPLEMENTED $3,190 $6,310 $3,190
54,807
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs