Assessment Year | 1995 |
---|---|
Principal Product | Touchless Car Washers |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
75,000
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,414 | 882,181 |
kWh
|
$0.065 |
Natural Gas | $20,602 | 4,730 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,020 | $22,280 |
$7,020
85,580
kWh
|
- | - | - | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $1,490 | $40 | - | - | - | $1,490 | |
03 | 3.8142: Distill contaminated solvents for reuse | $1,510 | $340 |
$(-10.0)
(-293)
kWh
|
- |
$250
-
gal
|
$1,270 | |
04 | 2.4133: Use most efficient type of electric motors | $920 | $980 |
$920
15,826
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $790 | $130 |
$790
15,826
kWh
|
- | - | - | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $380 | $500 | - | - | - | $380 | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $360 | $690 | - |
$360
-
MMBtu
|
- | - | |
08 | 3.8132: Use less toxic and volatile solvent substitutes | $300 | - | - | - | - | $300 | |
TOTAL RECOMMENDED | $12,770 | $24,960 |
$8,720
116,939
kWh
|
$360
-
MMBtu
|
$250
-
gal
|
$3,440 | ||
TOTAL IMPLEMENTED | $9,090 | $24,080 |
$8,730
117,232
kWh
|
$360
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs