ITAC Assessment: CO0296
ITAC logo
ITAC Assessment: CO0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electronics assembly equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 84
Plant Area 69,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,420 919,402
kWh
Natural Gas $7,750 1,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7291: Reschedule and rearrange multiple-source heating systems $2,750 $1,200 $2,280
29,601
kWh
$470
-
MMBtu
-
02 2.6231: Utilize controls to operate equipment only when needed $2,750 $1,620 $2,280
34,291
kWh
$470
-
MMBtu
-
03 2.7444: Close holes and openings in building such as broken windows $1,380 $600 - $1,380
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $1,980 $1,000
13,189
kWh
- -
05 2.7261: Install timers and/or thermostats $970 $1,200 $970
15,240
kWh
- -
06 2.3212: Optimize plant power factor $2,100 $2,100 - - $2,100
07 2.7447: Install vinyl strip / high speed / air curtain doors $670 $800 - $670
-
MMBtu
-
08 2.7135: Install occupancy sensors $610 $1,000 $610
7,913
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $600 $220 $600
7,913
kWh
- -
TOTAL RECOMMENDED $12,830 $10,720 $7,740
108,147
kWh
$2,990
-
MMBtu
$2,100
TOTAL IMPLEMENTED $3,650 $3,600 $1,600
21,102
kWh
$2,050
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings