| Assessment Year | 1994 |
|---|---|
| Principal Product | Electronics assembly equipment |
| NAICS |
n/a
|
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 84 |
| Plant Area |
69,000
ft2
|
| Annual Production | 300
pieces
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $70,420 | 919,402 |
kWh
|
$0.077 |
| Natural Gas | $7,750 | 1,928 |
MMBtu
|
$4.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,650 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7291: Reschedule and rearrange multiple-source heating systems | $2,750 | $1,200 |
$2,280
29,601
kWh
|
$470
-
MMBtu
|
- | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $2,750 | $1,620 |
$2,280
34,291
kWh
|
$470
-
MMBtu
|
- | |
| 03 | 2.7444: Close holes and openings in building such as broken windows | $1,380 | $600 | - |
$1,380
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,000 | $1,980 |
$1,000
13,189
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $970 | $1,200 |
$970
15,240
kWh
|
- | - | |
| 06 | 2.3212: Optimize plant power factor | $2,100 | $2,100 | - | - | $2,100 | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $670 | $800 | - |
$670
-
MMBtu
|
- | |
| 08 | 2.7135: Install occupancy sensors | $610 | $1,000 |
$610
7,913
kWh
|
- | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $600 | $220 |
$600
7,913
kWh
|
- | - | |
| TOTAL RECOMMENDED | $12,830 | $10,720 |
$7,740
108,147
kWh
|
$2,990
-
MMBtu
|
$2,100 | ||
| TOTAL IMPLEMENTED | $3,650 | $3,600 |
$1,600
21,102
kWh
|
$2,050
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs