ITAC Assessment: CO0291
ITAC logo
ITAC Assessment: CO0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Magnetic Tape Recording Equipment
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 265,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,230 12,563,013
kWh
Natural Gas $42,330 11,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
02 2.7135: Install occupancy sensors $2,720 $2,720 $2,720
67,409
kWh
-
03 2.7261: Install timers and/or thermostats $7,140 $7,690 - $7,140
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $780 $700 $780
20,516
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $450 $1,440 $450
12,016
kWh
-
06 2.1213: Direct warmest air to combustion intake $440 $1,290 - $440
-
MMBtu
07 2.2625: Chill water to the highest temperature possible $370 $240 $370
14,068
kWh
-
TOTAL RECOMMENDED $11,900 $14,080 $4,320
114,009
kWh
$7,580
-
MMBtu
TOTAL IMPLEMENTED $4,320 $5,100 $4,320
114,009
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs