ITAC Assessment: CO0285
ITAC logo
ITAC Assessment: CO0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Aircraft crew seats
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 183
Plant Area 115,000
ft2
Annual Production 1,128
pieces
Production Hrs. Annual 5,746
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,751 3,291,032
kWh
Natural Gas $43,007 11,171
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $92,610 $6,220 - - - $92,610
02 2.2437: Recover waste heat from equipment $9,680 $2,010 - $9,680
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $5,720 $8,500 $5,720
125,733
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,170 $7,020 $5,170
113,716
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,840 $130 $1,840
40,445
kWh
- - -
06 2.2511: Insulate bare equipment $1,400 $480 $1,400
30,774
kWh
- - -
07 2.7261: Install timers and/or thermostats $1,540 $750 $770
28,136
kWh
$770
-
MMBtu
- -
08 2.4221: Install compressor air intakes in coolest locations $1,540 $1,000 $1,540
33,998
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,470 $3,320 $1,470
32,239
kWh
- - -
10 2.4133: Use most efficient type of electric motors $1,290 $2,790 $1,290
28,429
kWh
- - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $860 $400 $860
18,757
kWh
- - -
12 2.3137: Use power during off-peak periods $660 $120 - - $660 -
13 2.7134: Use photocell controls $310 $560 $310
6,741
kWh
- - -
TOTAL RECOMMENDED $124,090 $33,300 $20,370
458,968
kWh
$10,450
-
MMBtu
$660 $92,610
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs