ITAC Assessment: CO0281
ITAC logo
ITAC Assessment: CO0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cardboard Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 138,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 4,624
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,822 3,325,029
kWh
Natural Gas $152,935 43,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $19,600 $64,900 - $19,600
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,830 $18,320 $7,830
138,628
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,790 $150 $1,790
31,653
kWh
- -
04 2.7314: Reduce ventilation air $1,450 $1,050 $1,450
55,686
kWh
- -
05 2.7261: Install timers and/or thermostats $1,100 $1,370 $650
24,912
kWh
$450
-
MMBtu
-
06 2.3137: Use power during off-peak periods $890 $360 - - $890
07 2.7444: Close holes and openings in building such as broken windows $880 $50 - $880
-
MMBtu
-
TOTAL RECOMMENDED $33,540 $86,200 $11,720
250,879
kWh
$20,930
-
MMBtu
$890
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs