ITAC Assessment: MO0081
ITAC logo
ITAC Assessment: MO0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Die Castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 15,000
ft2
Annual Production 851
pieces
Production Hrs. Annual 6,375
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,915 982,122
kWh
LPG $37,828 6,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $7,157 $2,995 - - $7,157
02 2.8113: Purchase gas directly from a contract gas supplier $3,319 - - - $3,319
03 2.2511: Insulate bare equipment $337 $11 - $337
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $130 $359
6,448
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $691 $3,036 $691
12,603
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $676 $60 $676
12,309
kWh
- -
07 2.4314: Use synthetic lubricant $492 $120 $492
9,086
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $243 $163 $243
4,396
kWh
- -
TOTAL RECOMMENDED $13,274 $6,515 $2,461
44,842
kWh
$337
-
MMBtu
$10,476
TOTAL IMPLEMENTED $9,955 $6,515 $2,461
44,842
kWh
$337
-
MMBtu
$7,157
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs