Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Playground Equipment
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 98,000
ft2
Annual Production 1,114
ton
Production Hrs. Annual 2,040
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,784 549,929
kWh
Electricity Demand $19,390 2,148
kW-mo/yr
Natural Gas $35,611 5,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,651 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $168

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $92 $51 $92
1,544
kWh
- - -
02 2.1135: Repair furnaces and oven doors so that they seal efficiently $417 $390 - - $417
-
MMBtu
-
03 2.7135: Install occupancy sensors $115 $273 $115
1,935
kWh
- - -
04 2.7135: Install occupancy sensors $314 $200 $314
5,264
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $427 - $226
3,786
kWh
$201
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $168 $205 $168
2,818
kWh
- - -
07 2.7144: Install spectral reflectors / delamp $2,533 $800 $1,597
26,438
kWh
$936
-
kW-mo/yr
- -
08 2.7134: Use photocell controls $370 $1,800 $370
6,206
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $678 $3,225 $678
11,383
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $83 - $52
872
kWh
$31
-
kW-mo/yr
- -
11 2.7491: Insulate glazing, walls, ceilings, and roofs $1,347 $647 - - $1,347
-
MMBtu
-
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $687 $900 $345
5,794
kWh
$342
-
kW-mo/yr
- -
13 4.426: Modify workload $21,420 $3,781 - - - $21,420
TOTAL RECOMMENDED $28,651 $12,272 $3,957
66,040
kWh
$1,510
-
kW-mo/yr
$1,764
-
MMBtu
$21,420
TOTAL IMPLEMENTED $168 $205 $168
2,818
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs