Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cloth Emblems
NAICS
n/a
SIC 2395: Pleating, Decorative and Novelty Stitching, and Tucking for the Trade
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 40,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,674 620,164
kWh
Natural Gas $5,552 1,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $340 $150 $200
7,913
kWh
$140
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,880 $580 $1,880
30,188
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $830 $250 - - $830
04 2.4221: Install compressor air intakes in coolest locations $290 $110 $290
4,689
kWh
- -
05 2.7243: Improve air circulation with destratification fans / other methods $2,420 $3,600 $(-130.0)
(-2,052)
kWh
$2,550
-
MMBtu
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $420 $1,000 $630
13,189
kWh
$(-210.0)
-
MMBtu
-
TOTAL RECOMMENDED $6,180 $5,690 $2,870
53,927
kWh
$2,480
-
MMBtu
$830
TOTAL IMPLEMENTED $2,220 $730 $2,080
38,101
kWh
$140
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs