Assessment Year | 1993 |
---|---|
Principal Product | Commercial Floor Cleaning Equipment |
NAICS |
n/a
|
SIC | 3579: Office Machines, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
118,000
ft2
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $112,583 | 1,189,625 |
kWh
|
$0.095 |
Natural Gas | $13,654 | 3,338 |
MMBtu
|
$4.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,990 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7444: Close holes and openings in building such as broken windows | $780 | $190 | - |
$780
-
MMBtu
|
|
02 | 2.7226: Use computer programs to optimize hvac performance | $260 | $50 |
$100
3,810
kWh
|
$160
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,250 | $400 |
$1,250
13,189
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $280 | $240 |
$280
2,931
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $610 | $450 |
$610
6,448
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,950 | $4,030 |
$4,950
52,462
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $660 | $720 |
$660
7,913
kWh
|
- | |
08 | 2.7135: Install occupancy sensors | $560 | $3,600 |
$490
15,826
kWh
|
$70
-
MMBtu
|
|
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,280 | $3,490 | - |
$1,280
-
MMBtu
|
|
10 | 2.4133: Use most efficient type of electric motors | $1,200 | $4,840 |
$1,200
12,603
kWh
|
- | |
TOTAL RECOMMENDED | $11,830 | $18,010 |
$9,540
115,182
kWh
|
$2,290
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,990 | $5,530 |
$2,830
32,533
kWh
|
$160
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs