ITAC Assessment: NV0083
ITAC logo
ITAC Assessment: NV0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Roofing Material
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 16,000
ft2
Annual Production 110,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,575 2,203,693
kWh
Electricity Demand $32,298 4,233
kW-mo/yr
Electricity Fees $4,090 -
Natural Gas $200,556 72,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,602

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,066 $150 $1,066
18,464
kWh
- -
02 2.4133: Use most efficient type of electric motors $536 $330 $444
7,620
kWh
$92
-
kW-mo/yr
-
03 2.7134: Use photocell controls $2,988 $680 $2,182
38,101
kWh
$806
-
kW-mo/yr
-
04 2.7134: Use photocell controls $1,309 $470 $1,309
22,860
kWh
- -
05 2.7135: Install occupancy sensors $333 $164 $287
4,982
kWh
$46
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $4,110 $4,316 - - $4,110
-
MMBtu
07 4.322: Eliminate old stock and modify inventory control - - - - -
TOTAL RECOMMENDED $10,342 $6,110 $5,288
92,027
kWh
$944
-
kW-mo/yr
$4,110
-
MMBtu
TOTAL IMPLEMENTED $1,602 $480 $1,510
26,084
kWh
$92
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs