Assessment Year | 1998 |
---|---|
Principal Product | Ball Valves |
NAICS |
n/a
|
SIC | 3491: Industrial Valves |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
30,000
ft2
|
Annual Production | 20,000
pieces
|
Production Hrs. Annual | 2,700
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,315 | 902,403 |
kWh
|
$0.056 |
Natural Gas | $16,430 | 2,020 |
MMBtu
|
$8.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,415 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,855 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $288 | $87 |
$288
5,275
kWh
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $346 | $1,956 |
$346
6,155
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $115 | $128 |
$115
2,052
kWh
|
- | - | - | |
04 | 2.4314: Use synthetic lubricant | $179 | $336 |
$179
3,224
kWh
|
- | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $4,542 | $3,816 |
$4,542
81,477
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $53 | $20 |
$53
879
kWh
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $350 | $225 | - |
$350
-
MMBtu
|
- | - | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $262 | $620 | - | - |
$262
-
Tgal
|
- | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,780 | $5,000 | - | - | - | $3,780 | |
10 | 4.515: Install shelves / racks to utilize unused space | $35,500 | - | - | - | - | $35,500 | |
TOTAL RECOMMENDED | $45,415 | $12,188 |
$5,523
99,062
kWh
|
$350
-
MMBtu
|
$262
-
Tgal
|
$39,280 | ||
TOTAL IMPLEMENTED | $4,855 | $7,999 |
$813
14,654
kWh
|
- |
$262
-
Tgal
|
$3,780 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs