ITAC Assessment: WV0131
ITAC logo
ITAC Assessment: WV0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ball Valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 30,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,700
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,315 902,403
kWh
Natural Gas $16,430 2,020
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,855

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $288 $87 $288
5,275
kWh
- - -
02 2.4133: Use most efficient type of electric motors $346 $1,956 $346
6,155
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $115 $128 $115
2,052
kWh
- - -
04 2.4314: Use synthetic lubricant $179 $336 $179
3,224
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $4,542 $3,816 $4,542
81,477
kWh
- - -
06 2.2511: Insulate bare equipment $53 $20 $53
879
kWh
- - -
07 2.2437: Recover waste heat from equipment $350 $225 - $350
-
MMBtu
- -
08 3.4111: Use closed cycle process to minimize waste water production $262 $620 - - $262
-
Tgal
-
09 3.5315: Lease / purchase baler; sell cardboard to recycler $3,780 $5,000 - - - $3,780
10 4.515: Install shelves / racks to utilize unused space $35,500 - - - - $35,500
TOTAL RECOMMENDED $45,415 $12,188 $5,523
99,062
kWh
$350
-
MMBtu
$262
-
Tgal
$39,280
TOTAL IMPLEMENTED $4,855 $7,999 $813
14,654
kWh
- $262
-
Tgal
$3,780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs