Assessment Year | 2016 |
---|---|
Principal Product | Lighting |
NAICS | 335110: Electric Lamp Bulb and Part Manufacturing |
SIC | 3641: Electric Lamp Bulbs and Tubes |
Sales Range | $100 M to 500M |
# of Employees | 330 |
Plant Area |
310,000
ft2
|
Annual Production | 2,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $266,142 | 6,700,800 |
kWh
|
$0.040 | |
Electricity Demand | $315,726 | 18,714 |
kW-mo/yr
|
$16.87 | |
Natural Gas | $161,294 | 38,426 |
MMBtu
|
$4.20 | |
Waste Disposal Costs | |||||
Water Usage | $70,800 | 5,750 |
Tgal
|
$12.31 | |
TOTAL YEARLY COSTS | $813,962 | ||||
RECOMMENDED SAVINGS* | $83,056 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $59,300 | $135,630 |
$27,119
683,100
kWh
|
$23,078
-
kW-mo/yr
|
- | - | - | $9,103 | |
02 | 2.7245: Use direct air supply to exhaust hoods | $11,227 | $15,000 |
$1,266
31,883
kWh
|
$2,541
-
kW-mo/yr
|
$7,420
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $819 | $100 |
$767
19,320
kWh
|
$652
-
kW-mo/yr
|
- | - | $(-300.0) | $(-300.0) | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,088 | $3,600 |
$1,088
27,393
kWh
|
- | - | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,896 | $100 |
$1,566
39,437
kWh
|
$1,330
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,793 | $2,000 |
$970
24,420
kWh
|
$823
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $168 | $799 | - | - |
$168
-
MMBtu
|
- | - | - | |
08 | 2.2135: Repair and eliminate steam leaks | $106 | $200 | - | - |
$106
-
MMBtu
|
- | - | - | |
09 | 3.4113: Treat and reuse rinse waters | $5,659 | $7,720 | - | - | - |
$5,659
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $83,056 | $165,149 |
$32,776
825,553
kWh
|
$28,424
-
kW-mo/yr
|
$7,694
-
MMBtu
|
$5,659
-
Tgal
|
$(-300.0) | $8,803 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs