Assessment Year | 1993 |
---|---|
Principal Product | Fabricated Sheet Metal |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
105,000
ft2
|
Annual Production | 1,090,000
lb
|
Production Hrs. Annual | 5,382
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,889 | 915,592 |
kWh
|
$0.057 |
Natural Gas | $11,252 | 2,961 |
MMBtu
|
$3.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $6,630 | $250 |
$40
879
kWh
|
$6,590
-
MMBtu
|
- | |
02 | 2.8121: Apply for tax-free status for energy purchases | $2,050 | $250 | - | - | $2,050 | |
03 | 2.7314: Reduce ventilation air | $560 | $30 |
$220
8,206
kWh
|
$340
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,250 | $90 |
$2,250
39,859
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $640 | $240 |
$640
11,430
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $310 | $200 |
$310
5,569
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $310 | $750 |
$310
5,569
kWh
|
- | - | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $670 | $460 |
$670
11,723
kWh
|
- | - | |
09 | 2.4314: Use synthetic lubricant | $460 | - |
$460
8,206
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $190 | $420 |
$190
3,224
kWh
|
- | - | |
11 | 2.4133: Use most efficient type of electric motors | $1,210 | $2,640 |
$1,210
21,395
kWh
|
- | - | |
TOTAL RECOMMENDED | $15,280 | $5,330 |
$6,300
116,060
kWh
|
$6,930
-
MMBtu
|
$2,050 | ||
TOTAL IMPLEMENTED | $12,630 | $1,480 |
$3,650
69,167
kWh
|
$6,930
-
MMBtu
|
$2,050 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs