ITAC Assessment: CO0247
ITAC logo
ITAC Assessment: CO0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Injection Molded Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area 134,000
ft2
Annual Production 4,400,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,460 7,355,803
kWh
Natural Gas $46,034 12,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $7,020 $1,250 $7,020
136,577
kWh
- - -
02 2.2612: Use cooling tower water instead of refrigeration $2,990 $1,800 $2,990
89,097
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,480 $2,560 $3,480
71,805
kWh
- - -
04 2.7111: Reduce illumination to minimum necessary levels $1,610 $40 $1,610
48,066
kWh
- - -
05 2.1123: Install automatic stack damper $6,430 $6,000 - $6,430
-
MMBtu
- -
06 2.7243: Improve air circulation with destratification fans / other methods $5,850 $7,600 $(-130.0)
(-2,638)
kWh
$5,980
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $490 $780 $490
9,965
kWh
- - -
08 2.7224: Reduce space conditioning during non-working hours $590 $1,350 $400
12,016
kWh
$190
-
MMBtu
- -
09 2.4224: Upgrade controls on compressors $5,970 $12,000 $350
7,034
kWh
- - $5,620
10 2.7442: Keep doors and windows shut when not on use $230 $530 - $230
-
MMBtu
- -
11 2.4133: Use most efficient type of electric motors $3,470 $6,280 $3,470
71,512
kWh
- - -
12 2.8114: Change rate schedules or other changes in utility service $9,050 $30,250 - - $9,050 -
TOTAL RECOMMENDED $47,180 $70,440 $19,680
443,434
kWh
$12,830
-
MMBtu
$9,050 $5,620
TOTAL IMPLEMENTED $47,180 $70,440 $19,680
443,434
kWh
$12,830
-
MMBtu
$9,050 $5,620
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs