ITAC Assessment: CO0244
ITAC logo
ITAC Assessment: CO0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Caulk
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 50,000
ft2
Annual Production 2,425,000
lb
Production Hrs. Annual 2,892
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,460 588,511
kWh
Natural Gas $13,589 3,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,040 $30 $1,040
13,775
kWh
-
02 2.7444: Close holes and openings in building such as broken windows $1,380 $1,300 - $1,380
-
MMBtu
03 2.2437: Recover waste heat from equipment $530 $600 - $530
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,220 $1,720 $1,220
16,120
kWh
-
05 2.4133: Use most efficient type of electric motors $300 $850 $300
3,810
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $190 $20 $190
2,638
kWh
-
07 2.2511: Insulate bare equipment $150 $30 $150
2,052
kWh
-
TOTAL RECOMMENDED $4,810 $4,550 $2,900
38,395
kWh
$1,910
-
MMBtu
TOTAL IMPLEMENTED $4,810 $4,550 $2,900
38,395
kWh
$1,910
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs