ITAC Assessment: CO0241
ITAC logo
ITAC Assessment: CO0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Cast Aluminum
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 32,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,573 170,281
kWh
Natural Gas $42,158 9,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $3,250 $5 - $3,250
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,920 $3,500 - $6,920
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $530 $200 $530
6,155
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $370 $110 $370
4,396
kWh
-
05 2.7444: Close holes and openings in building such as broken windows $460 $250 - $460
-
MMBtu
06 2.2511: Insulate bare equipment $340 $450 - $340
-
MMBtu
07 2.4133: Use most efficient type of electric motors $240 $1,110 $240
2,931
kWh
-
TOTAL RECOMMENDED $12,110 $5,625 $1,140
13,482
kWh
$10,970
-
MMBtu
TOTAL IMPLEMENTED $12,110 $5,625 $1,140
13,482
kWh
$10,970
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs