ITAC Assessment: CO0222
ITAC logo
ITAC Assessment: CO0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product INJECTION MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,713 4,242,966
kWh
Natural Gas $11,408 2,995
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,015 $1,034 $2,015
36,635
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $498 - $352
6,448
kWh
- $146
03 2.2511: Insulate bare equipment $8,970 $10,720 $8,970
163,540
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,060 $1,810 $1,060
19,343
kWh
- -
05 2.7261: Install timers and/or thermostats $214 $150 $52
2,052
kWh
$162
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $1,271 $1,972 $1,271
23,154
kWh
- -
07 2.7243: Improve air circulation with destratification fans / other methods $2,350 $4,000 $(-103.0)
(-2,052)
kWh
$2,453
-
MMBtu
-
TOTAL RECOMMENDED $16,378 $19,686 $13,617
249,120
kWh
$2,615
-
MMBtu
$146
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs