ITAC Assessment: CO0215
ITAC logo
ITAC Assessment: CO0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WOOD CABINETS
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 3,445
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,169 1,885,991
kWh
Natural Gas $22,762 6,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $1,377 $250 $1,140
-
kWh
$237
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,582 $2,280 $3,582
63,599
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,543 $900 $622
11,137
kWh
$921
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,955 $2,000 - $1,955
-
MMBtu
05 2.2437: Recover waste heat from equipment $900 $1,200 - $900
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $500 $200 $500
8,206
kWh
-
07 2.7261: Install timers and/or thermostats $2,035 $4,200 $110
4,396
kWh
$1,925
-
MMBtu
08 2.4133: Use most efficient type of electric motors $215 $685 $215
3,810
kWh
-
TOTAL RECOMMENDED $12,107 $11,715 $6,169
91,148
kWh
$5,938
-
MMBtu
TOTAL IMPLEMENTED $12,107 $11,715 $6,169
91,148
kWh
$5,938
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs