Assessment Year | 2009 |
---|---|
Principal Product | Insulated Wire Products |
NAICS | 331529: Other Nonferrous Metal Foundries (except Die-Casting) |
SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
147,400
ft2
|
Annual Production | 16,518
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $938,193 | 20,424,000 |
kWh
|
$0.046 |
Natural Gas | $1,667,749 | 170,151 |
MMBtu
|
$9.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,415 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,803 | $27,853 |
$4,680
101,710
kWh
|
- | $202 | - | $1,921 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $443 | $162 |
$447
9,723
kWh
|
- | $75 | $(-79.0) | - | |
03 | 2.7135: Install occupancy sensors | $1,629 | $1,927 |
$1,629
35,407
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $171 | $238 |
$42
1,183
kWh
|
- | $66 | $63 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,906 | - |
$2,049
44,577
kWh
|
- | $264 | $(-407.0) | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,212 | $5,316 |
$1,212
26,356
kWh
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $157 | - |
$157
3,410
kWh
|
- | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $322 | $575 |
$322
6,966
kWh
|
- | - | - | - | |
09 | 2.4323: Use optimum size and capacity equipment | $780 | $5,456 |
$780
16,976
kWh
|
- | - | - | - | |
10 | 2.2136: Install / repair insulation on steam lines | $14,132 | $5,776 | - |
$14,132
-
MMBtu
|
- | - | - | |
11 | 2.2135: Repair and eliminate steam leaks | $2,694 | $57 | - |
$2,694
-
MMBtu
|
- | - | - | |
12 | 2.6211: Conserve energy by efficient use of vending machines | $166 | - |
$166
3,600
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $30,415 | $47,360 |
$11,484
249,908
kWh
|
$16,826
-
MMBtu
|
$607 | $(-423.0) | $1,921 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs