ITAC Assessment: IA0248
ITAC logo
ITAC Assessment: IA0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product processed meat products
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 100,000
ft2
Annual Production 39,650
ton
Production Hrs. Annual 5,304
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,064 12,714,830
kWh
Electricity Demand $277,571 26,760
kW-mo/yr
Natural Gas $32,374 7,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,434 $13,248 $5,739
164,420
kWh
$2,695
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $3,780 - $2,329
66,823
kWh
$1,451
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $641 - $413
11,723
kWh
$228
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $604 $125 $368
10,551
kWh
$236
-
kW-mo/yr
TOTAL RECOMMENDED $13,459 $13,373 $8,849
253,517
kWh
$4,610
-
kW-mo/yr
TOTAL IMPLEMENTED $12,818 $13,373 $8,436
241,794
kWh
$4,382
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs