ITAC Assessment: MS0374
ITAC logo
ITAC Assessment: MS0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 150,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 2,550
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,910 5,478,711
kWh
Electricity Demand $331,476 18,786
kW-mo/yr
Electricity Fees $(-38,518.0) -
Wood $172,835 310,855
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $57,503 $375,001 $31,862
663,800
kWh
$57,348
-
kW-mo/yr
$1,338 $(-33,045.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,956 $12,825 $4,238
88,283
kWh
$9,452
-
kW-mo/yr
$266 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,534 $285 $2,534
51,969
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,632 $16,560 $2,027
42,228
kWh
$3,522
-
kW-mo/yr
$83 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,392 $10,340 $1,583
32,972
kWh
$2,744
-
kW-mo/yr
$65 -
06 2.4239: Eliminate or reduce compressed air usage $1,329 $771 $1,309
27,284
kWh
- $20 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,023 $7,463 $371
7,738
kWh
$637
-
kW-mo/yr
$15 -
TOTAL RECOMMENDED $86,369 $423,245 $43,924
914,274
kWh
$73,703
-
kW-mo/yr
$1,787 $(-33,045.0)
TOTAL IMPLEMENTED $27,537 $47,473 $10,753
223,190
kWh
$16,355
-
kW-mo/yr
$429 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs