Assessment Year | 1984 |
---|---|
Principal Product | LUMBER(PINE) |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 96 |
Plant Area |
n/a
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $177,425 | 3,839,097 |
kWh
|
$0.046 |
Natural Gas | $252,650 | 58,813 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,728 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $355 | $577 |
$355
6,448
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $551 | $408 |
$733
15,826
kWh
|
- | - | $(-182.0) | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,477 | $762 |
$2,477
50,703
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $799 | $348 |
$799
17,292
kWh
|
- | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $822 | $840 |
$2,654
56,272
kWh
|
- |
$(-1,832.0)
-
MMBtu
|
- | |
06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $30,530 | $69,200 |
$(-11,190.0)
(-201,348)
kWh
|
$41,720
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $35,534 | $72,135 |
$(-4,172.0)
(-54,807)
kWh
|
$41,720
-
MMBtu
|
$(-1,832.0)
-
MMBtu
|
$(-182.0) | ||
TOTAL IMPLEMENTED | $1,728 | $1,825 |
$3,742
78,546
kWh
|
- |
$(-1,832.0)
-
MMBtu
|
$(-182.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs