ITAC Assessment: LT0011
ITAC logo
ITAC Assessment: LT0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product LUMBER(PINE)
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 96
Plant Area
n/a
Annual Production 20,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,425 3,839,097
kWh
Natural Gas $252,650 58,813
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $355 $577 $355
6,448
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $551 $408 $733
15,826
kWh
- - $(-182.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,477 $762 $2,477
50,703
kWh
- - -
04 2.2437: Recover waste heat from equipment $799 $348 $799
17,292
kWh
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $822 $840 $2,654
56,272
kWh
- $(-1,832.0)
-
MMBtu
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $30,530 $69,200 $(-11,190.0)
(-201,348)
kWh
$41,720
-
MMBtu
- -
TOTAL RECOMMENDED $35,534 $72,135 $(-4,172.0)
(-54,807)
kWh
$41,720
-
MMBtu
$(-1,832.0)
-
MMBtu
$(-182.0)
TOTAL IMPLEMENTED $1,728 $1,825 $3,742
78,546
kWh
- $(-1,832.0)
-
MMBtu
$(-182.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs